A Binary and Bricks publication
Constropedia
Material Testing

Consistency of Cement Test Using Vicat Apparatus

The Vicat plunger test that finds the minimum water a cement needs to form a paste, with a worked example giving 40 per cent.

Consistency of cement

It is a minimum quantity of water requirement to start chemical reaction with cement to form a paste. Hence consistency test helps to calculate minimum requirement of water to make cement paste.

Standard Consistency: Requirement of water for making cement paste can be found out by the plunger of the Vicat apparatus penetrating the cement paste to about 5mm to 7mm from the bottom of Vicat mould.

Cement test references in your pocket Concrete Calculator All in One has cement testing references — consistency, setting time, soundness — and mix design tables.
Try the app

Apparatus and Material requirement

Vicat Apparatus: It has a frame with moveable rod with cap at one end. It has plunger which insert in cement paste. It has length scale to measure depths. It has a glass plate at base and mould for cement paste.

Blue Vicat apparatus with sliding rod, graduated scale and needle lowered onto a cement specimen in its mould

Weighing Balance: 1000 grams weigh scale with least count of 1 gram.

Stop watch: To measure Time.

Tray: To make cement Paste.

Measuring cylinder: To measure water. Cylinder may be of 200 ml.

Procedure

Line drawing of a Vicat apparatus in side and front view, parts lettered A to L, scale marked 0 to 40
  • Check the conditions in the lab: Lab temperature should be around 27 degree Celsius. Humidity should be around 65%.
  • Take 400 grams of cement. Add water in it. Measure the Quantity of water added.
  • Mix cement and water properly for 3 – 5 minutes. Make a good paste.
  • Fill the Vicat Mould with Paste. Fill it to the edge. Smoothen the top surface of the paste.
  • Remove air content in the mould with mild shakes.
  • Immediately place the mould on Vicat apparatus base. Base should be smooth.
  • Lower the Plunger to touch the top of paste and release it quickly.
  • Let the plunger go deep in the cement paste.
  • Note the reading of the depth by plunger.
  • It should be 33-35 mm. Means depth from bottom should be 5-7 mm, as mould is of 40 mm depth.
  • If depth is more then try next sample with less quantity of water. If depth is less then try next sample with more water.
  • Repeat these tests until desired result is achieved.
Diagram of cement paste in a 40 mm deep mould with the plunger stopping 5–7 mm from the bottom

Formula and Calculations

Percentage of water = ( Weight of water added / Weight of cement ) × 100

Example- If water added is 120 ml to form consistency in 400 grams of cement.

then,

Percentage of water = ( 120 / 400 ) × 100 = 30%